Arc Flash Studies
Understand arc flash exposure at the equipment your team operates and maintains. AES studies the equipment and operating configurations in scope and helps your team decide what to verify or address first.
When to call
Facility managers, safety teams, and electrical contractors can start here when a site has missing or outdated labels, plans to replace switchgear or change protective devices, or needs to understand how a system change could affect a prior study.
What to have ready
Share the facility city and state, the equipment or areas of concern, and your decision or outage date. Useful records include one-line diagrams, prior studies or label inventories, utility fault-current information, and protective device settings. Identify generators or alternate feeds and flag what has changed or needs field verification. AES can arrange private transfer for drawings and reports.
What to prepare for an electrical studyWhat the study can deliver
- A report documenting the study boundary, source data, assumptions, and operating configurations evaluated.
- Calculated incident energy and arc-flash boundaries for equipment covered by the selected method.
- An equipment label schedule or labels when included in scope, with unresolved items identified before issue.
- Findings and practical options for further verification or mitigation, prioritized with the facility team.
Study basis
AES confirms the applicable calculation method and editions during scoping. Where IEEE 1584 applies, it provides a method for calculating incident energy and arc-flash boundaries. NFPA 70E addresses electrical safe work practices. The equipment and operating conditions evaluated define where the results apply.
Tell us what changed, which equipment is affected, and when you need a decision.
Request an arc flash consultation