Contact
Let's talk engineering
Share the project location, what you need to decide, and your target date. AES will use the details to assess scope and availability.
Scope your project
- Facility city and state, and equipment or process affected
- The decision you need to make and your target date
- Drawings, equipment data or other records you have
Facility power assessment
Describe what changed or keeps recurring.
Generator and transfer-switch engineering
Share the bid stage, who approves the work, and whether a load list or single-line diagram is available.
Share what you know. List available records so we can arrange private transfer if needed.
Direct Contact
Reach us directly
- Phone470-305-3833
- Emailinfo@atkengsol.com
- HeadquartersAtlanta, GA
- ResponseCall for time-sensitive enquiries
Is this a good fit?
Where AES helps
- PE-sealed engineering and studies
- Power studies & NFPA compliance programs
- Facility upgrades & construction coordination
- Federal, utility, pharma, and critical infrastructure engagements
Where AES is not a fit
- Drafting-only work without engineering scope
- Residential electrical projects
- Engagements outside PE licensure states
What Happens Next
A clear 3-step engagement process
From first call to signed authorization — we keep the path transparent.
1
Initial Consultation
A 20–30 minute call with our principal engineer to understand your scope, facility, and deadlines.
2
Scope & Schedule Alignment
We exchange data requirements, clarify boundaries, and confirm the right AES discipline leads.
3
Proposal & Authorization
A clear, fixed-fee or T&M proposal with deliverables, schedule, and PE-sealed milestones.
